参考文献/References:
[1] NOVOSELOV A. Growth of large sapphire crystals:lessons learned[J]. Journal of Crystal Growth,2022,578:126431.[2] ZHANG Y F,ZHU S L,ZHAO Y Y,et al. A material point method based investigation on crack classification and transformation induced by grit geometry during scratching silicon carbide[J]. International Journal of Machine Tools and Manufacture,2022,177:103884.[3] LIN J M,JIANG F,WEN Q L,et al. Deformation anisotropy of nano-scratching on C-plane of sapphire:a molecular dynamics study and experiment[J]. Applied Surface Science,2021,546:149091.[4] 倪嘉铭. 碳化硅高速磨削表面完整性研究[J]. 机械设计与制造,2019(11):167-169,173.[5] 段念,王文珊,于怡青,等. 基于FEM与SPH耦合算法的单颗磨粒切削玻璃的动态过程仿真[J]. 中国机械工程,2013,24(20):2716-2721.[6] MIR A,LUO X C,CHENG K,et al. Investigation of influence of tool rake angle in single point diamond turning of silicon[J]. The International Journal of Advanced Manufacturing Technology,2018,94(5):2343-2355.[7] TRAN T T. Study of the SPH Method for Simulation in LSDYNA[J]. International Journal of Scienc and Research,2018,7(8):271-274.[8] 焦培刚. 光滑粒子流体动力学方法及应用[M]. 北京:化学工业出版社,2021.[9] ZHANG B,GUO X T,LIU Y,et al. Study of glass laminate configurations on ballistic resistance of novel lightweight sapphire transparent laminated structures[J]. International Journal of Lightweight Materials and Manufacture,2021,4(4):397-404.[10] 袁巨龙,邓朝晖,熊万里,等. 高效磨削技术与装备进展及展望[J]. 航空制造技术,2010,53(5):66-70.[11] 李远,黄辉,于怡青,等. 切磨过程中花岗石材料去除机理研究[J]. 矿物学报,2001,21(3)401-405.[12] ZHANG B,YIN J F. The ‘skin effect’ of subsurface damage distribution in materials subjected to high-speed machining[J]. International Journal of Extreme Manufacturing,2019,1(1):012007.
相似文献/References:
[1]黄国凯.拱梁组合体系拱桥关键节点有限元分析[J].福建工程学院学报,2019,17(03):242.[doi:10.3969/j.issn.1672-4348.2019.03.007]
HUANG Guokai.Finite element analysis of key-joints of arch-girder combination bridge[J].Journal of FuJian University of Technology,2019,17(03):242.[doi:10.3969/j.issn.1672-4348.2019.03.007]
[2]唐瑜、吴庆雄、袁辉辉.混合梁斜拉桥主梁钢-混凝土结合段受力性能研究[J].福建工程学院学报,2019,17(03):247.[doi:10.3969/j.issn.1672-4348.2019.03.008]
TANG Yu,WU Qingxiong,YUAN Huihui.Study on the mechanical performance of the main gorder’s steel-concrete joint section of a hybrid girder cable-stayed bridge[J].Journal of FuJian University of Technology,2019,17(03):247.[doi:10.3969/j.issn.1672-4348.2019.03.008]
[3]蒋逸凡,唐瑜,章建彬.双塔单索面人行钢斜拉桥的设计与受力分析[J].福建工程学院学报,2022,20(06):537.[doi:10.3969/j.issn.1672-4348.2022.06.005]
JIANG Yifan,TANG Yu,ZHANG Jianbing.Design and mechanical analysis of a double-tower single-plane steel cable-stayed bridge for pedestrians[J].Journal of FuJian University of Technology,2022,20(03):537.[doi:10.3969/j.issn.1672-4348.2022.06.005]