[1]黄建华,李瑞.临江工程抗浮水位计算方法分析[J].福建工程学院学报,2022,20(06):520-526.[doi:10.3969/j.issn.1672-4348.2022.06.002]
 HUANG Jianhua,LI Rui.Analysis of calculation method of anti-floating water level in riverside projects[J].Journal of FuJian University of Technology,2022,20(06):520-526.[doi:10.3969/j.issn.1672-4348.2022.06.002]
点击复制

临江工程抗浮水位计算方法分析()
分享到:

《福建工程学院学报》[ISSN:2097-3853/CN:35-1351/Z]

卷:
第20卷
期数:
2022年06期
页码:
520-526
栏目:
出版日期:
2022-12-25

文章信息/Info

Title:
Analysis of calculation method of anti-floating water level in riverside projects
作者:
黄建华李瑞
福建工程学院土木工程学院
Author(s):
HUANG Jianhua LI Rui
School of Civil Engineering, Fujian University of Technology
关键词:
抗浮水位半经验公式法临江工程基底浮力地下水渗流
Keywords:
anti-floating water level semi empirical formula method riverside projects base buoyancy groundwater seepage
分类号:
TU46
DOI:
10.3969/j.issn.1672-4348.2022.06.002
文献标志码:
A
摘要:
临江工程场地因其土层渗透性较强,且江水在汛期内水位变化加剧对场区内地下水带来很大影响,不宜直接采用地面高程或洪水位作为建筑抗浮水位。对此,以福州地区某一临江工程为例,提出根据规范法、基于地下水渗流理论的半经验公式法和数值模拟法来预测抗浮水位,3种方法得到的建议抗浮水位分别为10.00、9.78、9.08 m。并通过统计周边场地水位资料,发现勘察期间历史最高水位和洪水位高程普遍低于以上3 种方法的计算结果。验证了临江建筑抗浮水位直接采用地面高程或江水洪水位的不足和片面,为今后类似建设项目抗浮水位的选取和抗浮设计施工提供参考和依据。
Abstract:
Due to the strong permeability of the soil layer and the intensified water level change of the river water during the flood season, the underground water in the site is greatly affected. Therefore, the ground elevation or flood level should not be directly used as the anti-floating water level of the building. In this regard, with a riverside project in Fuzhou as an example, it was proposed to predict the anti-floating water level according to the standard method, the semi empirical formula method based on the groundwater seepage theory and the numerical simulation method. The recommended anti floating water levels obtained by the three methods are 10.00m, 9.78m and 9.08m respectively. Through the statistics of water level data of surrounding sites, it was found that the historical highest water level and flood level elevation during the survey were generally lower than the calculation results of the above three methods. The research verifies the inadequacy and one-sidedness of directly using the ground elevation or river flood level of riverside buildings, and provides reference and basis for the selection of safe anti-floating water level and anti-floating design and construction of similar construction projects in the future.

参考文献/References:

[1] 王海东, 罗雨佳. 超大地下室施工期抗浮破坏机理分析与应对思考[J]. 铁道科学与工程学报, 2019, 16(10):2538-2546.[2] 赵宇. 地下室上浮破坏原因分析及处理措施研究[D]. 杭州:浙江大学, 2013.[3] 王军辉, 陶连金, 韩煊, 等. 我国结构抗浮水位研究现状与展望[J]. 水利水运工程学报, 2017(3):124-132.[4] MEHL S, HILL M C. Development and evaluation of a local grid refinement method for block-centered finite-difference groundwater models using shared nodes[J]. Advances in Water Resources, 2002, 25(5):497-511.[5] ISMAIL W M Z W, YUSOFF I, RAHIM B E E A. Simulation of horizontal well performance using Visual MODFLOW[J]. Environmental Earth Sciences, 2013, 68(4):1119-1126.[6] 王宇博. 抗浮水位确定方法的对比分析研究:以长春地铁2号线东延三道村东站为例[J]. 西北地质, 2020, 53(4):207-215.[7] KHADRI S F R, PANDE C. Ground water flow modeling for calibrating steady state using MODFLOW software: a case study of Mahesh River basin, India[J]. Modeling Earth Systems and Environment, 2016, 2(1):39.[8] 薛禹群. 地下水动力学原理[M]. 北京:地质出版社, 1986.[9] 安振东, 刘贯群, 张焘, 等. 建筑物场区地下水位预测与抗浮水位确定:以青岛啤酒城改造为例[J]. 中国海洋大学学报(自然科学版), 2015, 45(4):103-109.[10] 王宇博, 徐永亮, 周玉凤, 等. 基于GMS模型的保利未来城抗浮设防水位研究[J]. 河北地质大学学报, 2019, 42(5):56-62.[11] 张旷成, 丘建金. 关于抗浮设防水位及浮力计算问题的分析讨论[J]. 岩土工程技术, 2007, 21(1):15-20.[12] 余良刚. 岩体基坑地下室抗浮设计水头合理取值研究[D]. 青岛:青岛理工大学, 2013.[13] 刘涛. 成都地铁临河地下车站抗浮设防水位取值探讨[J]. 智能城市, 2021, 7(2):45-46.[14] 曹洪, 朱东风, 骆冠勇, 等. 临江地下结构抗浮计算方法研究[J]. 岩土力学, 2017, 38(10):2973-2979, 2988.