[1]范冰辉,高志瀚,王素裹,等.海峡两岸BIM技术应用成熟度对比研究[J].福建工程学院学报,2017,15(06):543-548.[doi:10.3969/j.issn.1672-4348.2017.06.008]
 Fan Binghui,Gao Zhihan,Wang Suguo,et al.Maturity comparison of BIM technique application between Chinese Mainland and Taiwan[J].Journal of FuJian University of Technology,2017,15(06):543-548.[doi:10.3969/j.issn.1672-4348.2017.06.008]
点击复制

海峡两岸BIM技术应用成熟度对比研究()
分享到:

《福建工程学院学报》[ISSN:2097-3853/CN:35-1351/Z]

卷:
第15卷
期数:
2017年06期
页码:
543-548
栏目:
出版日期:
2017-12-25

文章信息/Info

Title:
Maturity comparison of BIM technique application between Chinese Mainland and Taiwan
作者:
范冰辉高志瀚王素裹刘益宝
福州大学土木工程学院
Author(s):
Fan Binghui Gao Zhihan Wang Suguo Liu Yibao
School of Civil Engineering, Fuzhou University
关键词:
BIM 成熟度 应用现状 生命周期
Keywords:
BIM application status maturity model performance deployment measures
分类号:
TU17
DOI:
10.3969/j.issn.1672-4348.2017.06.008
文献标志码:
A
摘要:
BIM技术的普遍应用已经成为我国建筑业发展的趋势。为全面揭示BIM技术应用的现状并提出推动BIM发展的部署措施,选取我国大陆代表性省份与台湾地区的工程技术人员进行问卷调查;引入成熟度模型,从5个维度对调查结果进行数据处理和分析结果表明,两岸建设行业对于BIM技术均有较强的需求,但目前大陆的BIM应用程度相对较低,在建设工程生命周期的使用中还处于初步阶段;业界对BIM的投资效果尚缺乏足够认同,BIM技术的推广还有较多障碍;基于成熟度模型分析的结论,针对性地提出了发展BIM的措施建议。
Abstract:
The universal application of BIM technique has become the new trend of Chinese construction industry. To reflect the application status of BIM throughout China and to put forward measures to promote the development of BIM, a questionnaire survey was conducted among engineers and technicians from the representative provinces of the mainland and Taiwan;the maturity model was introduced to process and analyze the results from five dimensions. It was found that the construction industry in both sides has fairly strong demand for BIM technique; however, the mainland has a comparatively low degree of BIM application, and the implementation involved in the life cycle of construction engineering is still at the initial stage; moreover, the industry has not agreed on the investment effectiveness of BIM, and there are still many obstacles to promote BIM. Based on the conclusions of the maturity model’s analysis, measures and suggestions were put forward for BIM development.

参考文献/References:

[1] Vanlande R, Nicolle C, Cruz C.IFC and building lifecycle management[J]. Automation in Construction,2008,18(1):70-78.
[2] 胡振中,路新瀛,张建平.基于建筑信息模型的桥梁工程全寿命期管理应用框架[J]. 公路交通科技,2010,27(1):20-24.
[3] 贺灵童.BIM在全球的应用现状[J].工程质量,2013,31(3):12-19.
[4] 何关培.中国工程建设BIM应用研究报告[R].北京:中国建筑工业出版社,2011:34.
[5] 何清华,钱丽丽,段运峰,等.BIM在国内外应用的现状及障碍研究[J].工程管理学报,2012,26(1):12-16.
[6] 何关培.《中国工程建设BIM 应用研究报告2011》解析[J].土木建筑工程信息技术,2012,4(1):15-21.
[7] Succar B. The Five Components of BIM Performance Measurement[C]∥.Proceedings of 18th CIB World Building Congress,2010,Salford,UK.
[8] Lin S. Understanding the Effectiveness of Capability Maturity Model Integration by Examining the Knowledge Management of Software Development Processes[J]. Total Quality Management & Business Excellence,2009,54(5):509-521.
[9] Succar B, Sher W, WilliamsA. An integrated approach to BIM competency assessment, acquisition and application[J]. Automation in Construction,2013,35:174-189.
[10] Barlish K, Sullivan K. How to measure the benefits of BIM-A case study approach[J]. Automation in Construction,2012,24:149-159.
[11] 范冰辉,高志瀚,陈栋灿.闽台建筑企业伙伴评估模式构建[J].福建建筑,2011,162(12):99-101.
[12] Eadie R, Browne M, Odeyinka H, et.al. BIM implementation throughout the UK construction project lifecycle: An analysis[J]. Automation in Construction,2013,36:145-151.
[13] National Institute of Building Science. United States National Building Information Modeling Standard, Version 1-Part 1[R]. http://buildingsmartalliance.org,2007:53.
[14] Zuppa D, Raja R, Issa A, et.al. BIM’s impact on the success measures of construction projects[J]. Computing in Civil Engineering,2009,346:503-512.

相似文献/References:

[1]曾建仙,张雪丽,赵冬香.基于REVIT族的刚接柱脚BIM方法研究[J].福建工程学院学报,2014,12(06):519.[doi:10.3969/j.issn.1672-4348.2014.06.003]
 Zeng Jianxian,Zhang Xueli,Zhao Dongxiang.Research into BIM method of rigid column foot based on REVIT family[J].Journal of FuJian University of Technology,2014,12(06):519.[doi:10.3969/j.issn.1672-4348.2014.06.003]
[2]陈宝健、范冰辉、刘益宝.基于BIM技术的桥梁工程施工成本控制[J].福建工程学院学报,2019,17(03):236.[doi:10.3969/j.issn.1672-4348.2019.03.006]
 CHEN Baojian,FAN Binghui,LIU Yibao.Cost control of bridge construction based on BIM tehnique[J].Journal of FuJian University of Technology,2019,17(06):236.[doi:10.3969/j.issn.1672-4348.2019.03.006]
[3]陈永乐.基于建筑设计教学的构件族库开发——以幕墙族为例[J].福建工程学院学报,2019,17(06):606.[doi:10.3969/j.issn.1672-4348.2019.06.017]
 CHEN Yongle.Development of a library for the component family based on architectural design teaching: a case study of the curtain wall family[J].Journal of FuJian University of Technology,2019,17(06):606.[doi:10.3969/j.issn.1672-4348.2019.06.017]

更新日期/Last Update: 2017-12-25