[1]张鹏辉,吴波,杨思.盾构隧道下穿施工引起的铁路轨道沉降变形数值研究[J].福建工程学院学报,2016,14(04):332-338.[doi:10.3969/j.issn.1672-4348.2016.04.005]
 Zhang Penghui,Wu Bo,Yang Si.Numerical study on settlement and deformation of railway tracks induced by shield tunnelling crossing under railway track[J].Journal of FuJian University of Technology,2016,14(04):332-338.[doi:10.3969/j.issn.1672-4348.2016.04.005]
点击复制

盾构隧道下穿施工引起的铁路轨道沉降变形数值研究()
分享到:

《福建工程学院学报》[ISSN:2097-3853/CN:35-1351/Z]

卷:
第14卷
期数:
2016年04期
页码:
332-338
栏目:
出版日期:
2016-08-25

文章信息/Info

Title:
Numerical study on settlement and deformation of railway tracks induced by shield tunnelling crossing under railway track
作者:
张鹏辉吴波杨思
福建工程学院土木工程学院
Author(s):
Zhang Penghui Wu Bo Yang Si
Collega of Civil Engineering, Fujian University of Technology
关键词:
盾构隧道 数值模拟 轨道沉降 水平偏差 轨向偏差
Keywords:
shield tunnel numerical simulation track settlement horizontal deviation track direction deviation
分类号:
U45
DOI:
10.3969/j.issn.1672-4348.2016.04.005
文献标志码:
A
摘要:
结合福州某地铁双线盾构隧道下穿铁路轨道的工程实例,采用有限元数值模拟与实测值相结合的方法,分析研究了盾构隧道在下穿的施工过程中对轨道沉降、轨道水平偏差以及轨向偏差影响的一般性规律,探讨了不同盾构隧道埋深条件下的轨道沉降与变形规律。研究表明,轨道沉降主要发生在盾构掌子面到达前、盾构通过期间及盾尾通过后的3个阶段;最大水平偏差一般出现在掌子面到达隧轨相交处位置;最大轨向偏差一般发生在掌子面到达轨道线路之前或通过轨道线路以后1倍的盾构隧道直径左右的距离位置;同时表明,在不考虑地下水位的情况下,盾构隧道埋深越大,轨道线路沉降与变形越小,列车运行越平稳安全。
Abstract:
Combined with an engineering example of a double line shield tunnel crossing underneath railway track in Fuzhou, finite element numerical simulation and measurement data were utilized to analyse the regularity of the influences of shield tunnel crossing underneath railway track on the track settlement, the track horizontal deviation and the track direction deviation. The track settlement and deformation under the condition of different tunnel depths were discussed. The track settlement occurs mainly at three stages: before the arrival of the shield tunnel face, during the passing period of the shield, and after the pass of the shield tail. The maximum horizontal deviation usually occurs at the time when the tunnel face arrives at the intersection position of the shield tunnel and the railway track. The maximum track direction deviation usually occurs before tunnel face arrives at the track or approximately 1 times of the diameter of the shield tunnel after shield tunnel face passes the track. At the same time, when the underground water level is not considered, the greater the depth of the shield tunnel and the smaller the settlement and the deformation of the track line, the more stable the train operates.

参考文献/References:

[1] 邹春华,周顺华,王长丹,等.路基不均匀沉降引起有砟轨道沉降的计算方法[J].同济大学学报(自然科学版),2013,41(8):1237-1242.
[2] Burland J B, Standing J R, Jardine F M. Building response to tunnelling, case studies from construction of the Jubilee LineExtension[M]. London: Thomas Telford Publishing,2001:509-545.
[3] 葛世平,廖少明,陈立生.地铁隧道建设与运营对地面房屋的沉降影响与对策[J].岩石力学与工程学报,2008,27(3):550-556.
[4] 张达栋.地铁盾构隧道施工引起地表沉降机制及数值分析[J].公路交通科技(应用技术版),2015(2):181-183.
[5] 王伟忠,臧延伟.盾构下穿既有铁路线路地基加固方案与效果分析[J].铁道建筑,2007(6):63-65.
[6] 徐干成,李成学,王后裕,等.地铁盾构隧道下穿京津城际高速铁路影响分析[J].岩土力学,2009,30(S1):269-276.
[7] 许有俊,陶连金,李文博,等.地铁双线盾构隧道下穿高速铁路路基沉降分析[J].北京工业大学学报,2010,36(12):1619-1622.
[8] 铁道部. 铁路路基设计规范:TB10001-2005[S].北京:中国铁道出版社,2005.
[9] 铁道部. 铁路隧道设计规范:TB10003-2005[S].北京:中国铁道出版社,2005.
[10] 娄国充.铁路隧道下穿既有路基沉降规律及控制标准研究[D].北京:北京交通大学, 2012.

相似文献/References:

[1]潘钦锋.平行双孔隧道开挖变形三维数值分析[J].福建工程学院学报,2014,12(06):524.[doi:10.3969/j.issn.1672-4348.2014.06.004]
 Pan Qinfeng,Luo Xiaodong.Numerical simulation on effects of different construction processes on behaviour of parallel twin tunnels[J].Journal of FuJian University of Technology,2014,12(04):524.[doi:10.3969/j.issn.1672-4348.2014.06.004]
[2]赵振伟,吴波,黄惟,等.盾构施工参数对地层变形的影响[J].福建工程学院学报,2015,13(03):205.[doi:10.3969/j.issn.1672-4348.2015.03.001]
 Zhao Zhenwei,Wu Bo,Huang Wei,et al.The effect of parameters of shield tunnel construction on soil deformation[J].Journal of FuJian University of Technology,2015,13(04):205.[doi:10.3969/j.issn.1672-4348.2015.03.001]
[3]王火生,王乾廷,黎文峰.大型螺旋锥齿轮热处理变形的数值模拟与测量[J].福建工程学院学报,2015,13(04):338.[doi:10.3969/j.issn.1672-4348.2015.04.007]
 Wang Huosheng,Wang Qianting,Li Wenfeng.Numerical simulation and measurement of heat treatment deformation for large spiral bevel gear[J].Journal of FuJian University of Technology,2015,13(04):338.[doi:10.3969/j.issn.1672-4348.2015.04.007]
[4]王鸣涛,吴波,张鹏辉.盾构隧道施工引起铁路路基沉降槽宽度系数计算方法[J].福建工程学院学报,2016,14(03):212.[doi:10.3969/j.issn.1672-4348.2016.03.002]
 Wang Mingtao,Wu Bo,Zhang Penghui.Calculation method of width parameters of railway roadbed settlement trough caused by shield tunnel construction[J].Journal of FuJian University of Technology,2016,14(04):212.[doi:10.3969/j.issn.1672-4348.2016.03.002]
[5]叶际斌.既有桥梁车辆荷载行进过程数学模型构建[J].福建工程学院学报,2017,15(03):215.[doi:10.3969/j.issn.1672-4348.2017.03.003]
 Ye Jibin.Construction of mathematical model for vehicles’ loaded passing existing bridge[J].Journal of FuJian University of Technology,2017,15(04):215.[doi:10.3969/j.issn.1672-4348.2017.03.003]
[6]林光忠.岩溶区桥梁桩基沉降量计算的数值分析[J].福建工程学院学报,2018,16(01):13.[doi:10.3969/j.issn.1672-4348.2018.01.003]
 LIN Guangzhong.Numerical analysis of settlement calculation of bridge pile foundation in karst area[J].Journal of FuJian University of Technology,2018,16(04):13.[doi:10.3969/j.issn.1672-4348.2018.01.003]
[7]李彦民.列车荷载对下穿盾构隧道影响的模型试验[J].福建工程学院学报,2019,17(06):539.[doi:10.3969/j.issn.1672-4348.2019.06.005]
 LI Yanmin.Model test study on the influence of train load on shield tunnel[J].Journal of FuJian University of Technology,2019,17(04):539.[doi:10.3969/j.issn.1672-4348.2019.06.005]
[8]赵勇博,吴波,王鸣涛.盾构隧道下穿铁路群引起路基沉降的数值研究[J].福建工程学院学报,2016,14(04):339.[doi:10.3969/j.issn.1672-4348.2016.04.006]
 Zhao Yongbo,Wu Bo,Wang Mingtao.Numerical study on embankment settlement induced by shield tunnelling under railway track groups[J].Journal of FuJian University of Technology,2016,14(04):339.[doi:10.3969/j.issn.1672-4348.2016.04.006]
[9]矫永刚.盾构开挖顶推力对下平行隧道影响的数值分析[J].福建工程学院学报,2020,18(01):46.[doi:10.3969/j.issn.1672-4348.2020.01.009]
 JIAO Yonggang.Numeric alanalysis of the influence of shield excavation jacking force on the lower parallel tunnel[J].Journal of FuJian University of Technology,2020,18(04):46.[doi:10.3969/j.issn.1672-4348.2020.01.009]

更新日期/Last Update: 2016-08-25