[1]武玉娇,詹金武,郑晋溪,等.城市轨道交通单护盾TBM刀盘掘进数值模拟[J].福建理工大学学报,2025,23(03):245-253.[doi:10.3969/j.issn.2097-3853.2025.03.006]
 WU Yujiao,ZHAN Jinwu,ZHENG Jinxi,et al.Numerical simulation of single shield TBM cutterhead excavation in urban rail transit[J].Journal of Fujian University of Technology;,2025,23(03):245-253.[doi:10.3969/j.issn.2097-3853.2025.03.006]
点击复制

城市轨道交通单护盾TBM刀盘掘进数值模拟
分享到:

《福建理工大学学报》[ISSN:2097-3853/CN:35-1351/Z]

卷:
第23卷
期数:
2025年03期
页码:
245-253
栏目:
出版日期:
2025-06-25

文章信息/Info

Title:
Numerical simulation of single shield TBM cutterhead excavation in urban rail transit
作者:
武玉娇詹金武郑晋溪邵顺安刘国杨炽誉
福建理工大学土木工程学院
Author(s):
WU Yujiao ZHAN Jinwu ZHENG Jinxi SHAO Shun’an LIU Guo YANG Chiyu
School of Civil Engineering, Fujian University of Technology
关键词:
TBM隧道刀盘破岩掘进速度刀盘转矩有限元分析
Keywords:
TBM tunnel cutterhead breaking rock excavation speed cutterhead torque finite element analysis
分类号:
U455.3
DOI:
10.3969/j.issn.2097-3853.2025.03.006
文献标志码:
A
摘要:
依据福州滨海快线实测数据,利用有限元软件对刀盘掘进进行数值模拟,分析了不同掘进速度、不同转矩下刀盘的受力。结果表明:岩石越坚硬,刀盘的掘进速度越低,刀盘的转矩和旋转速度越高;随着极径增大,刀轴的应力平均值逐渐增大,刀盘的应力平均值呈现先增大后减小的趋势,极径大的刀轴处和刀盘中间位置易受到破坏;刀盘始发阶段易受到冲击荷载,其应力值较大,之后应力逐渐递减,最后趋于稳定。
Abstract:
Based on the measured data of Fuzhou Binhai Expressway, the finite element software was used to numerically simulate the cutterhead excavation. The force analysis of the cutterhead was carried out under different excavation speeds and torques. Analysis shows that the harder the rock, the lower the excavation speed of the cutterhead, and the higher the torque and rotation speed of the cutterhead; as the pole diameter increases, the average stress value of the cutter shaft gradually increases, and the average stress of the cutter head increases first and then decreases. The cutter shaft and the middle position of the cutter head with larger pole diameters are prone to damage; during the initial stage of the cutterhead, it is susceptible to impact loads, resulting in high stress values. Subsequently, the stress gradually decreases and eventually stabilizes.

参考文献/References:

[1] HASANPOUR R,SCHMITT J,OZCELIK Y,et al. Examining the effect of adverse geological conditions on jamming of a single shielded TBM in Uluabat tunnel using numerical modeling[J]. Journal of Rock Mechanics and Geotechnical Engineering,2017,9(6):1112-1122.[2] CUI J,XU W H,FANG Y,et al. Performance of slurry shield tunnelling in mixed strata based on field measurement and numerical simulation[J]. Advances in Materials Science and Engineering,2020,2020:6785260.[3] LI T,ZHANG Z Y,JIA C T,et al. Investigating the cutting force of disc cutter in multi-cutter rotary cutting of sandstone:simulations and experiments[J]. International Journal of Rock Mechanics and Mining Sciences,2022,152:105069.[4] 石晓阳,郭子琦,夏明,等. 复合地层土压平衡盾构刀盘掘进参数[J]. 科学技术与工程,2023,23(9):3956-3965.[5] 孙文喆,霍艳芳,刘建琴,等. 基于大数据的TBM刀盘切削比能预测研究[J]. 机械设计,2022,39(6):58-65.[6] 高峰,黄兴,刘泉声,等. 基于人工神经网络多模型迁移学习的隧(巷)道机械化掘进装备控制参数自主决策方法[J]. 岩石力学与工程学报,2023,42(6):1405-1420.[7] 张佳琦, 苏翠侠, 刘浩飞,等. 一种高效的刀盘掘进过程数值模拟算法[J]. 应用力学学报,2024(6):1-10. [8] 杨振兴,曾垂刚,张凯,等. 软硬不均地层对盾构刀盘受力计算方法与分析[J]. 科学技术与工程,2022,22(25):11163-11169.[9] 顾刚,颜永国,冯春,等. 复合地层盾构刀盘掘进速率及受力特性分析[J]. 隧道建设(中英文),2018,38(11):1895-1902.